Check the operating mode beside the programme
Read whether the relevant channel shows ONCE, TIMED or continuous ON. The LP guide uses the SELECT control to change that channel's mode. If the intention is to follow the stored separate periods, select the documented TIMED mode rather than rewriting every event. On a dual-channel programmer, check heating and hot water individually because their mode selections can differ.
Remember that availability is not constant firing
A scheduled on period allows the associated thermostatic controls to request heat; it does not mean the heat source must run continuously. Record the selected mode alongside the room temperature if the result remains unexpected. If the display already shows TIMED but heating continues through a genuine programmed off period, preserve the current times and any override indication. That is a different enquiry from deliberately selecting the all-day span.
Useful observations
- Read the mode for the affected channel, not only its saved times.
- Use TIMED when the intended behaviour is the separate stored periods.
Details to include in your enquiry
- Is ONCE selected instead of TIMED?
- Does heating availability span the first start and final finish?
An assessment establishes the appropriate work. Leave fixed fittings and concealed connections in place, and do not reproduce an unsafe symptom.
Further information
Your model’s instructions take precedence over general guidance.